Week 3 - 13th October 2014
Still more rain but still chipping away at other tasks:
Just because we can't cut the grass on the Green at the moment there are still the banks that need looking after.
Then there's a coat of paint on the newly constructed metal rack for the Sisis cylinders!
Then there's a coat of paint on the newly constructed metal rack for the Sisis cylinders!
One of the Green spray heads became faulty during the 2014 Summer period and now needs to be replaced, so a little digging was required to gain access to it.
In addition the green needed an Autumn general feed which enhances various aspects of the grass and the soil so a quick run up and down for an hour and half with the granule spreader was required. This had to be done though when the grass was dry. A little difficult in October but thankfully Sunday 19th was a sunny and windy day so that was another job to cross of the list! (No photo I am afraid)
In addition the green needed an Autumn general feed which enhances various aspects of the grass and the soil so a quick run up and down for an hour and half with the granule spreader was required. This had to be done though when the grass was dry. A little difficult in October but thankfully Sunday 19th was a sunny and windy day so that was another job to cross of the list! (No photo I am afraid)
Click Here to return to Week selection page. Click Here to go to previous week OR Click Here to go to the next week.