Week 3 - 13th October 2014
Still more rain but still chipping away at other tasks:
![Picture](/uploads/2/5/6/4/25647137/1413388666.png)
Just because we can't cut the grass on the Green at the moment there are still the banks that need looking after.
Then there's a coat of paint on the newly constructed metal rack for the Sisis cylinders!
Then there's a coat of paint on the newly constructed metal rack for the Sisis cylinders!
![Picture](/uploads/2/5/6/4/25647137/8626845.jpg?1413737438)
One of the Green spray heads became faulty during the 2014 Summer period and now needs to be replaced, so a little digging was required to gain access to it.
In addition the green needed an Autumn general feed which enhances various aspects of the grass and the soil so a quick run up and down for an hour and half with the granule spreader was required. This had to be done though when the grass was dry. A little difficult in October but thankfully Sunday 19th was a sunny and windy day so that was another job to cross of the list! (No photo I am afraid)
In addition the green needed an Autumn general feed which enhances various aspects of the grass and the soil so a quick run up and down for an hour and half with the granule spreader was required. This had to be done though when the grass was dry. A little difficult in October but thankfully Sunday 19th was a sunny and windy day so that was another job to cross of the list! (No photo I am afraid)
Click Here to return to Week selection page. Click Here to go to previous week OR Click Here to go to the next week.